Tile Installation

This information is designed to outline the tiling installation procedure.
We are experienced in all aspects of tile preparation and installation.The adhesives, grouts, silicones and waterproofing system we use, are guaranteed to last you a long time when applied in accordance with manufacturer’s directions and tiling practice.
Tiling is normally scheduled after interior decoration and before carpet laying.

What To Do Prior To The Tiler Arriving

Ordering of Tiles:
We recommend selecting tiles at least 2 months prior to the tiler starting the job, as shipments can sometimes cause delays in tile stock arriving on time, or tiles can be deleted and no longer be available. At the time of tile selection, ask the retail shop to check availability with the importer. When ordering tiles, allow the tiles to arrive at least a week prior to job commencement, in order for them to arrive on time, for delivery to site, or collection from shop by tiler.
Clear any furniture, appliances, etc from the area to be tiled
Vacuum or sweep area so it is dust free
Any existing flooring , Carpet, vinyl and residue adhes ives are removed to the tiler’s satisfaction – unless this has been specifically quoted as preparation prior to tiling.
Arrange for underfloor heating to be installed and screeded, allowing 1-2 days for curing, before Tiler commences tile installation.
Trims need to be considered:
Chrome Round Edge trim or L Angle Aluminium trim for the wall tiles are available in either a matt or shiny finish. The thickness of the tile, together with an allowance for adhesive, will determine the size of the trim from 6mm up to 22mm. Depending on stock availability, time may have to be allowed for ordering and delivery of trims from supplier. The tile retailer or tiler can advise what size trim is suitable for your selected tile.
Grout colours and size of grout lines need to be considered:
– Floors; we use neutral grey grout unless another colour is specified, as it is an easy colour and wears well. We strongly advise against light colours on the floor, unless the grout lines are sealed after installation.
– Walls; these will be grouted to match the tile ie. White tile, white grout, or in a neutral grey colour.
Grout charts can be supplied for colour selection, and some need to be ordered in advance, if not a stock item.
tiles-v1
gallery_projects_21-1280x853
gallery_projects_22-1280x853

Call 347-740-0022 anytime... day or night
for free estimate!

gallery_projects_23-1280x853

When Tiler Is On-site

Tilers require access to water and electricity
Cutting, especially using a grinder or wet saw can be noisy, dusty and will usually be done outside or possibly, if wet, in a garage area
When the tiler is tiling, especially floors, it is preferable that other tradespeople are not obstructing his work area
Floor tiles should not be walked on for 24 hours after being laid. This allows for the adhesive to set properly. Some adhesives may take longer to set, which your tiler will advise.
After the tiles have been grouted, you will need to stay off the grout lines until cured.
post_08

After Completion Of Tiling

There may be some grout residue left on the tiles after the tiler has left. This can be buffed off with a dry cloth. If the tiles have a matt finish, the residue may be more stubborn, but will come off with two capfuls of methylated spirits, a few drops of detergent in a bucket of warm water. (Initially this could take a couple of washes with a mop) Diluted Salts with water can also remove the most stubborn residue.
Grout sealing – this is recommended for wet areas ie. Showers, kitchen floors and around kitchen benches. Sealing the grout repels staining from food, dirt and grease and inhibits mildew and bacteria. We recommend that clients apply sealer to the grout once it is fully cured (2-3 days).
hero_heating_02

Quality Of Workmanship

We will silicone in a matching colour to grout, between walls, floors and internal corners. If these areas are grouted, the grout will eventually crack and fall out.
Flexible adhesive is used on all new concrete floors to minimise tile breakage from any possible movement from concrete floors cracking.

What To Do Prior To The Tiler Arriving

Toilet Pans – If a toilet needs reinstating, this is the owners care and you may need a book the services of a plumber to do this.
Rubbish Removal – the offcuts of tile, cardboard boxes and any existing flooring that has been lifted eg. Carpet & vinyl, are the client’s property and disposal is assumed the owner’s responsibility. However, please advise the tiler if you would like any tile rubbish removed.
Refixing carpet – a carpet layer will be required to refix carpet at doorways.
Labour for floor preparation – this can be quoted as an estimate of time allowed.
Quantities calculated in quotations include a tile cutting wastage percentage (usually 10-15%) depending on the size of the tile and pattern layout. However, the final layout can determine whether there is a difference between tiles installed and the original quotation, therefore a surplus or deficit, still may occur.
We recommend owners keep spare tiles of the same batch, in case of future requirements, as tiles are deleted from time to time, or colours and design may alter significantly from batch to batch
floor-refinishing_v2

LET’S WORK TOGETHERuslevin@Live.com

WORKING HOURS
Mon - Fri 8AM - 7PM
Sunday CLOSED
LOCATION
8635 21st Avenue Brooklyn, NY Suit 6H
CALL CENTER
347-740-0022
Give us a free call 24/7
WRITE US
uslevin@Live.com

Copyright U.S LEVIN GRP CORP. © 2023. All Rights Reserved.