What belongs on a preconstruction checklist to keep an NYC attic remodeling project on time and on budget?

Drawings, Decisions, and Discovery—Before Demo

Great attic projects are won in precon. Start with coordinated architectural, structural, and energy sheets; capture existing conditions (dimensions, rafter depth, utilities, violations) and verify critical constraints: egress, ceiling height over required area, stair headroom, and dormer feasibility. Lock selections that drive lead times—windows, stair system, skylights, HVAC equipment, fixtures, and finish schedules—so procurement can begin immediately after filing.

Approvals, Logistics, and Protection

Confirm DOB filing strategy, special inspections, and (if applicable) landmark review. Create a site logistics plan covering debris path, dust containment, negative air, protection of lower floors, and neighbor notifications. Map structural shoring and sequencing if you’re reframing or adding dormers.

Budget & Schedule Controls

Issue an itemized estimate with allowances only where necessary, plus named alternates for quick value-engineering. Tie milestone payments to inspections (framing, rough MEP, insulation, final) and maintain a change-order ledger from day one. Build a two-week look-ahead and RFI/submittal log so trades don’t collide and materials hit the site just in time.

Commissioning Plan and Closeout

Schedule blower-door testing after air sealing, plan HVAC startup and balancing, and reserve time for punch and training on controls. Assemble a homeowner binder (warranties, cut sheets, paint formulas) before substantial completion.

Download a printable preconstruction checklist on our NYC attic remodeling service project management page.

LET’S WORK TOGETHERuslevin@Live.com

WORKING HOURS
Mon - Fri 8AM - 7PM

Sunday CLOSED
LOCATION
8635 21st Avenue Brooklyn, NY Suit 6H
CALL CENTER
347-740-0022

Give us a free call 24/7
WRITE US
uslevin@Live.com

Copyright U.S LEVIN GRP CORP. © 2023. All Rights Reserved.