Centralize Planning and Communication Managing several trades—plumbing, electrical, HVAC, and finishes—requires structured coordination. Start with a project manager or general contractor who oversees all schedules, permits, and quality checks. Use a shared project dashboard or app to track progress, material deliveries, and inspection dates in real time. Sequencing Work Efficiently Follow the correct sequence: demolition...

Expect 6–10 Months Depending on Scope The average NYC basement remodel runs between 6 to 10 months from initial design to final inspection. Factors such as permits, waterproofing complexity, and material lead times heavily influence duration. Start with a two-month planning and permit phase, including architectural drawings, DOB filing, and contractor selection. Typical Timeline Breakdown...

Plan for Realistic Durations A basement remodel in NYC typically spans 10–20 weeks depending on scope, permit complexity, and finish level. The secret to staying on track lies in preconstruction diligence—finalizing design, selections, and permits before any demolition begins. The baseline sequence: 1) Design & budgeting (2–4 weeks), 2) Permitting (3–6 weeks), 3) Demolition &...

Plan Occupied Remodeling Like a Mini Move-In Occupied basements demand a logistics plan. Create a sealed construction corridor from entry to stair with zipper doors, floor protection, and negative-pressure air scrubbers vented outside. Set quiet hours, delivery windows, and an inspector-ready access protocol in writing before demo. Weekly housekeeping (HEPA vacs, wipe-downs) prevents dust migration...

Lock the Critical Decisions Before Demo Schedule risk in basements comes from hidden conditions (slab dips, old plumbing) and late selections. Tame both with a preconstruction sprint: measured survey, moisture mapping, and a 100% selections package (tile, plumbing trims, lighting, millwork, hardware). Convert fuzzy allowances into model-specific line items so labor and rough-ins are accurate...

Phase the Work and Protect the Critical Path A typical basement remodel runs through four phases: Preconstruction (2–6 weeks), Permitting (varies), Build (8–16+ weeks), and Closeout (1–2 weeks). Preconstruction covers survey, schematic design, selections, and line-item budgeting; locking specifications early prevents rework. During permitting, submit DOB-ready drawings and order long-lead items—egress windows, custom millwork, panelboards,...

Sequence Inspections to Protect Finished Work Attic projects stack critical layers—air barrier, insulation, vapor control, and finishes—into a tight envelope. To avoid rework, map a milestone inspection plan that follows the assembly order: (1) framing/structural after any dormers, headers, or sistering; (2) rough MEP once electrical, plumbing, and HVAC lines are in and pressure-tested; (3)...

Run the Week, Don’t Let It Run You Adopt a simple cadence: weekly stand-up (15–20 minutes) with a live two-week look-ahead, a Friday closeout (photos, clean site, punch-by-phase), and a Monday materials check against inspection gates. Tie milestones to inspections—framing, rough MEP, insulation/air barrier, and final—and make sure long-lead deliveries land at least one cycle...

Front-Load Selections That Drive the Schedule Windows, skylights, custom stairs, HVAC equipment, and millwork set your timeline. Approve these before filing so purchase orders can drop as soon as permits land. Create a long-lead register with order dates, shop drawing deadlines, and delivery targets, and review it weekly with your GC. Two-Week Look-Aheads & Just-In-Time...

Drawings, Decisions, and Discovery—Before Demo Great attic projects are won in precon. Start with coordinated architectural, structural, and energy sheets; capture existing conditions (dimensions, rafter depth, utilities, violations) and verify critical constraints: egress, ceiling height over required area, stair headroom, and dormer feasibility. Lock selections that drive lead times—windows, stair system, skylights, HVAC equipment, fixtures,...

LET’S WORK TOGETHERuslevin@Live.com

WORKING HOURS
Mon - Fri 8AM - 7PM

Sunday CLOSED
LOCATION
8635 21st Avenue Brooklyn, NY Suit 6H
CALL CENTER
347-740-0022

Give us a free call 24/7
WRITE US
uslevin@Live.com

Copyright U.S LEVIN GRP CORP. © 2023. All Rights Reserved.