Sequence Inspections to Protect Finished Work Attic projects stack critical layers—air barrier, insulation, vapor control, and finishes—into a tight envelope. To avoid rework, map a milestone inspection plan that follows the assembly order: (1) framing/structural after any dormers, headers, or sistering; (2) rough MEP once electrical, plumbing, and HVAC lines are in and pressure-tested; (3)...

Run the Week, Don’t Let It Run You Adopt a simple cadence: weekly stand-up (15–20 minutes) with a live two-week look-ahead, a Friday closeout (photos, clean site, punch-by-phase), and a Monday materials check against inspection gates. Tie milestones to inspections—framing, rough MEP, insulation/air barrier, and final—and make sure long-lead deliveries land at least one cycle...

Front-Load Selections That Drive the Schedule Windows, skylights, custom stairs, HVAC equipment, and millwork set your timeline. Approve these before filing so purchase orders can drop as soon as permits land. Create a long-lead register with order dates, shop drawing deadlines, and delivery targets, and review it weekly with your GC. Two-Week Look-Aheads & Just-In-Time...

Drawings, Decisions, and Discovery—Before Demo Great attic projects are won in precon. Start with coordinated architectural, structural, and energy sheets; capture existing conditions (dimensions, rafter depth, utilities, violations) and verify critical constraints: egress, ceiling height over required area, stair headroom, and dormer feasibility. Lock selections that drive lead times—windows, stair system, skylights, HVAC equipment, fixtures,...

Milestones You Can Build Around Successful attic timelines hinge on well-sequenced approvals. Map your schedule to permit filing, plan examination, and inspections: framing/structural after dormers and headers are in; rough MEP when electrical, HVAC, and plumbing lines are ready; insulation/air-barrier before drywall closes assemblies; and final for occupancy. If special inspections apply (structural connections, energy...

Typical Phases & Durations A well-run attic conversion in New York City usually follows seven phases: (1) preconstruction (survey, existing conditions, filings) 2–4 weeks; (2) permitting & approvals 2–8+ weeks depending on scope and reviews; (3) demolition & discovery 3–7 days; (4) structural/framing & dormers 1–3 weeks; (5) rough MEP (electrical, HVAC, plumbing) 1–2 weeks;...

Build a Milestone-Driven Schedule Anchor your timeline to clear checkpoints: demo & discovery, structural/framing, rough MEP, insulation & air seal, drywall & finishes, trim & built-ins, and final commissioning. Lock product selections before filing: windows, doors, stairs, fixtures, and any custom millwork have the longest lead times. Add contingency buffers for DOB reviews, special inspections,...

A general contractor manages a full kitchen renovation schedule in New York by creating a detailed project plan that organizes each stage of work, from demolition to final inspection. The process begins with pre-construction planning: obtaining building approvals, filing Department of Buildings permits, and ordering long-lead items such as cabinetry, appliances, and countertops. By securing...

Yes, a New York kitchen remodel can be completed faster without sacrificing quality, but it requires careful planning, professional management, and realistic expectations. Speed comes from efficiency, not cutting corners. The first step is thorough pre-construction planning: finalizing design selections, securing permits, and ordering all long-lead materials before demolition begins. When cabinetry, appliances, and fixtures...

Delays are one of the most common challenges in New York kitchen remodeling, and they can increase costs and frustrate homeowners if not properly managed. The biggest risks come from permitting and inspections. The Department of Buildings requires permits for plumbing, gas, and electrical work, and scheduling inspections can take longer than expected. Co-op and...

LET’S WORK TOGETHERuslevin@Live.com

WORKING HOURS
Mon - Fri 8AM - 7PM

Sunday CLOSED
LOCATION
8635 21st Avenue Brooklyn, NY Suit 6H
CALL CENTER
347-740-0022

Give us a free call 24/7
WRITE US
uslevin@Live.com

Copyright U.S LEVIN GRP CORP. © 2023. All Rights Reserved.